top of page
Writer's pictureClearPath

780' of 36 Inch HDPE placed on-grade in Solid Rock.

Updated: May 31, 2019

ClearPath Utility Solutions, LLC was contracted to place 780' of 36 Inch HDPE. The project consisted of installing a drain pipe from one containment pond to a newly constructed containment pond. The HDD project would drill though the peak of a hill with depths requiring wire line services to accurately maintain the proper grade. In-Rock was contracted to provide the wire line services. A 48 Inch hole opener was pulled on the final pass. Upon completion, a 24 Inch HDPE line was placed inside the 36 Inch line.

HPDE drilling

0 comments

Recent Posts

See All

Comments


bottom of page